by Liz Burton | Dec 16, 2021 | Uncategorized
The Air Source Heat Pump has been delivered and craned into place at Teignmouth Lido in Teignbridge District Council last week. The ASHP will replace the old gas boilers for heating the water to the lido pool and provide a significant saving of 48.5 tonnes per annum...
by Liz Burton | Dec 6, 2021 | Uncategorized
We are so excited to announce that last Thursday Leisure Energy, in partnership with Ashford Borough Council and Freedom Leisure won the Best Use of Technology: Carbon Reduction Award at Civil Engineer: Techfest 2021. Judges comments on our submission for the Stour...
by Liz Burton | Dec 6, 2021 | Uncategorized
Energy works are progressing at Teignmouth Lido in Teignbridge District Council with a concrete slab pour on which to site the Air Source Heat Pump which will replace the existing gas-fired boilers within the facility. Heated water will be saved within 2 new storage...
by Liz Burton | Nov 29, 2021 | Uncategorized
We have just had confirmation that our CHAS accreditation has been accepted for another year, resulting in Leisure Energy ensuring that we are fully H&S compliant.
by Liz Burton | Nov 23, 2021 | Uncategorized
Solar photovoltaic panels have been installed at Eckington Swimming Pool and Fitness Centre in North East Derbyshire District Council (NEDDC) as part of the carbon reduction projects which are being funded by a £1,014,009 Public Sector Decarbonisation Scheme (PSDS)...
Recent Comments