Energy works are progressing at Teignmouth Lido in Teignbridge District Council with a concrete slab pour on which to site the Air Source Heat Pump which will replace the existing gas-fired boilers within the facility. Heated water will be saved within 2 new storage cylinders to serve the pool and associated buildings.
We are working with Alliance Leisure through PSDS funding from Salix Finance.

Contact Us